DETAILS OF FUNDS RELEASED UNDER MPLADS FOR 16th Lok Sabha duration 2014 to 2019 | |||||||||||||||||
Sl. No. |
Constituency Name/ Name of MP |
(2014-2015) Installment |
(2015-2016) Installment |
(2016-2017) Installment |
(2017-2018) Installment |
(2018-2019) Installment |
|||||||||||
1st | 2nd | Reasons for Non-Release |
1st | 2nd | Reasons for Non-Release |
1st | 2nd | Reasons for Non-Release |
1st | 2nd | Reasons for Non-Release |
1st | 2nd | Reasons for Non-Release |
|||
State : Uttar Pradesh(16th Lok Sabha) - Statement as on 04/09/2018 | |||||||||||||||||
1 | AGRA(SC) | ||||||||||||||||
Ram Shankar Katheria | 07/11/2014 | 18/05/2015 | - | 10/11/2015 | 06/05/2016 | - | 21/07/2016 | 03/01/2017 | - | 29/06/2017 | 23/02/2018 | - | - | - | NIL | ||
2 | AKBARPUR | ||||||||||||||||
Devendra Singh Alias Bhole Singh | 15/09/2014 | 24/07/2015 | - | 07/04/2016 | 23/08/2016 | - | 30/09/2016 | 15/03/2017 | - | 15/06/2017 | 09/05/2018 | - | - | - | Eligible MPR not received, Audit Certificate Pending, Utilisation Certificate Pending. | ||
3 | ALIGARH | ||||||||||||||||
Satish Kumar | 15/09/2014 | 15/04/2015 | - | 01/09/2015 | 09/03/2016 | - | 22/06/2016 | 12/04/2017 | - | 06/07/2017 | 08/02/2018 | - | - | - | Eligible MPR not received. | ||
4 | ALLAHABAD | ||||||||||||||||
Shyama Charan Gupta | 15/09/2014 | 24/07/2015 | - | 12/01/2016 | 24/08/2016 | - | 21/11/2016 | 16/05/2017 | - | 04/10/2017 | 19/04/2018 | - | - | - | Eligible MPR not received, Provisional Utilisation Certificate Pending. | ||
5 | AMETHI | ||||||||||||||||
Rahul Gandhi | 07/11/2014 | 10/03/2015 | - | 21/04/2016 | 07/09/2017 | - | 16/03/2018 | - | Eligible MPR not received, Audit Certificate Pending, Utilisation Certificate Pending. | - | - | - | - | - | - | ||
6 | AMROHA | ||||||||||||||||
Kanwar Singh Tanwar | 26/08/2014 | 15/04/2015 | - | 09/03/2016 | 16/06/2016 | - | 26/10/2016 | 27/07/2017 | - | 27/03/2018 | 09/07/2018 | - | - | - | Eligible MPR not received, Provisional Utilisation Certificate Pending. | ||
7 | AONLA | ||||||||||||||||
Dharmendra Kumar | 28/10/2014 | 09/03/2016 | - | 09/03/2016 | 15/03/2017 | - | 26/12/2017 | 19/06/2018 | - | - | - | Eligible MPR not received, Provisional Utilisation Certificate Pending. | - | - | - | ||
8 | AZAMGARH | ||||||||||||||||
Mulayam Singh Yadav | 15/09/2014 | 17/08/2015 | - | 17/05/2016 | 07/10/2016 | - | 04/05/2017 | 16/02/2018 | - | 26/07/2018 | - | NIL | - | - | - | ||
9 | BAGHPAT | ||||||||||||||||
Satya Pal Singh | 14/10/2014 | 24/05/2016 | - | 15/03/2017 | 25/07/2017 | - | 09/10/2017 | 13/03/2018 | - | 17/07/2018 | - | Eligible MPR not received, Audit Certificate Pending, Utilisation Certificate Pending. | - | - | - | ||
10 | BAHRAICH(SC) | ||||||||||||||||
Sadhvi Savitri Bai Foole | 28/10/2014 | 05/08/2015 | - | 08/02/2016 | 09/09/2016 | - | 11/07/2017 | - | Eligible MPR not received, Audit Certificate Pending, Utilisation Certificate Pending. | - | - | - | - | - | - | ||
11 | BALLIA | ||||||||||||||||
Bharat Singh | 28/10/2014 | 08/10/2015 | - | 07/10/2016 | 15/03/2017 | - | 08/08/2017 | 21/11/2017 | - | 27/03/2018 | 26/07/2018 | NIL | - | - | - | ||
12 | SHRAWASTI | ||||||||||||||||
Daddan Mishra | 11/09/2014 | 03/03/2015 | - | 16/11/2015 | 24/11/2016 | - | 20/07/2017 | 27/03/2018 | - | 26/07/2018 | - | NIL | - | - | - | ||
13 | BANSGAON(SC) | ||||||||||||||||
Kamlesh Paswan | 05/11/2014 | 07/08/2015 | - | 18/09/2015 | 09/09/2016 | - | 28/03/2017 | - | Eligible MPR not received, Audit Certificate Pending, Utilisation Certificate Pending. | - | - | - | - | - | - | ||
14 | BANDA | ||||||||||||||||
Bhairon Prasad Mishra | 05/11/2014 | 21/04/2015 | - | 27/01/2016 | 30/09/2016 | - | 16/12/2016 | 09/01/2018 | - | 21/06/2018 | - | Eligible MPR not received, Utilisation Certificate Pending. | - | - | - | ||
15 | BARABANKI(SC) | ||||||||||||||||
Priyanka Singh Rawat | 17/11/2014 | 13/07/2015 | - | 22/06/2016 | 29/03/2017 | - | 15/01/2018 | 08/06/2018 | - | - | - | Eligible MPR not received, Provisional Utilisation Certificate Pending. | - | - | - | ||
16 | BAREILLY | ||||||||||||||||
Sontosh Kumar Gangwar | 07/10/2014 | 16/12/2015 | - | 21/04/2016 | 30/09/2016 | - | 17/03/2017 | 19/04/2018 | - | 03/08/2018 | - | NIL | - | - | - | ||
17 | BASTI | ||||||||||||||||
Harish Chandra Alias Harish Dwivedi | 27/10/2014 | 20/08/2015 | - | 02/08/2016 | 27/07/2017 | - | 08/03/2018 | 14/06/2018 | - | - | - | Eligible MPR not received, Provisional Utilisation Certificate Pending. | - | - | - | ||
18 | BIJNOR | ||||||||||||||||
Kunwar Bhartendra | 22/09/2014 | 05/06/2015 | - | 08/10/2015 | 03/08/2016 | - | 05/10/2016 | 13/07/2017 | - | 09/05/2018 | 31/08/2018 | NIL | - | - | - | ||
19 | BHADOHI | ||||||||||||||||
Virendra Singh | 16/10/2014 | 02/07/2015 | - | 15/06/2016 | 24/10/2016 | - | 26/04/2017 | 07/11/2017 | - | 11/04/2018 | 31/05/2018 | - | - | - | Provisional Utilisation Certificate Pending. | ||
20 | BADAUN | ||||||||||||||||
Dharmendra Yadav | 21/10/2014 | 29/01/2016 | - | 09/08/2016 | 17/07/2017 | - | 01/03/2018 | 08/08/2018 | NIL | - | - | - | - | - | - | ||
21 | BULANDSHAHR(SC) | ||||||||||||||||
Bhola Singh | 17/09/2014 | 17/08/2015 | - | 09/03/2016 | 06/12/2016 | - | 09/05/2017 | 15/01/2018 | - | 16/04/2018 | 20/08/2018 | NIL | - | - | - | ||
22 | GAUTAM BUDDHA NAGAR | ||||||||||||||||
Mahesh Sharma | 26/09/2014 | 30/09/2015 | - | 11/04/2016 | 26/12/2016 | - | 04/10/2017 | 19/06/2018 | - | - | - | Eligible MPR not received, Provisional Utilisation Certificate Pending. | - | - | - | ||
23 | CHANDAULI | ||||||||||||||||
Mahendra Nath Pandey | 28/10/2014 | 16/11/2015 | - | 27/10/2016 | 19/12/2016 | - | 28/06/2017 | 23/01/2018 | - | 27/03/2018 | 30/07/2018 | NIL | - | - | - | ||
24 | DEORIA | ||||||||||||||||
Kalraj Mishra | 14/10/2014 | 24/07/2015 | - | 09/03/2016 | 19/10/2016 | - | 26/04/2017 | 02/02/2018 | - | 22/06/2018 | - | Eligible MPR not received, Utilisation Certificate Pending, Incorrect Audit Certificate. | - | - | - | ||
25 | DOMARIYAGANJ | ||||||||||||||||
Jagdambika Pal | 28/10/2014 | 30/09/2015 | - | 09/03/2016 | 07/11/2016 | - | 27/03/2017 | 22/08/2017 | - | 26/12/2017 | 29/06/2018 | - | - | - | Eligible MPR not received, Provisional Utilisation Certificate Pending. | ||
26 | ETAH | ||||||||||||||||
Rajveer Singh (Raju Bhaiya) | 14/10/2014 | 02/09/2015 | - | 22/06/2016 | 16/11/2016 | - | 22/06/2017 | 04/12/2017 | - | 27/03/2018 | 29/06/2018 | - | - | - | Eligible MPR not received, Provisional Utilisation Certificate Pending. | ||
27 | ETAWAH(SC) | ||||||||||||||||
Ashok Kumar Doharey | 03/12/2014 | 23/12/2016 | - | 09/08/2017 | 16/02/2018 | - | 26/07/2018 | - | NIL | - | - | - | - | - | - | ||
28 | FAIZABAD | ||||||||||||||||
Lallu Singh | 07/10/2014 | 21/09/2015 | - | 28/03/2016 | 30/09/2016 | - | 26/04/2017 | 30/11/2017 | - | 28/05/2018 | - | Eligible MPR not received. | - | - | - | ||
29 | FARRUKHABAD | ||||||||||||||||
Mukesh Rajput | 21/10/2014 | 29/07/2015 | - | 03/08/2016 | 14/12/2017 | - | 27/03/2018 | - | Incorrect Audit Certificate. | - | - | - | - | - | - | ||
30 | FATEHPUR | ||||||||||||||||
Niranjan Jyoti | 15/09/2014 | 10/08/2015 | - | 09/03/2016 | 08/11/2016 | - | 15/03/2017 | 11/12/2017 | - | - | - | Eligible MPR not received, Provisional Utilisation Certificate Pending. | - | - | - | ||
31 | FIROZABAD | ||||||||||||||||
Akshay Yadav | 22/10/2014 | 29/05/2015 | - | 04/11/2015 | 22/06/2017 | - | 18/10/2017 | 08/08/2018 | NIL | - | - | - | - | - | - | ||
32 | AMBEDKAR NAGAR | ||||||||||||||||
Hari Om Pandey | 28/08/2014 | 23/03/2015 | - | 12/01/2016 | 07/11/2016 | - | 03/05/2017 | 30/10/2017 | - | 09/03/2018 | 19/06/2018 | - | - | - | Eligible MPR not received, Provisional Utilisation Certificate Pending. | ||
33 | GHAZIPUR | ||||||||||||||||
Manoj Sinha | 27/10/2014 | 21/06/2016 | - | 23/09/2016 | 04/10/2017 | - | 19/06/2018 | 30/07/2018 | NIL | - | - | - | - | - | - | ||
34 | GHOSI | ||||||||||||||||
Harinarayan Rajbhar | 28/08/2014 | 12/02/2015 | - | 02/07/2015 | 31/12/2015 | - | 30/05/2016 | 11/11/2016 | - | 15/05/2017 | 31/05/2018 | - | - | - | Eligible MPR not received, Audit Certificate Pending, Utilisation Certificate Pending. | ||
35 | GONDA | ||||||||||||||||
Kirti Vardhan Singh | 14/10/2014 | 23/06/2015 | - | 16/12/2015 | 15/12/2016 | - | 28/06/2017 | 16/03/2018 | - | - | - | Eligible MPR not received, Provisional Utilisation Certificate Pending. | - | - | - | ||
36 | GORAKHPUR | ||||||||||||||||
Praveen Kumar Nishad | 05/11/2014 | 31/07/2015 | - | 18/09/2015 | 12/09/2016 | - | 27/03/2017 | - | - | - | - | - | - | - | Eligible MPR not received, Audit Certificate Pending, Utilisation Certificate Pending. | ||
37 | HAMIRPUR | ||||||||||||||||
Kanwar Pushpendra Singh Chandel | 22/09/2014 | 16/05/2017 | - | 22/11/2017 | 04/07/2018 | - | - | - | Eligible MPR not received, Provisional Utilisation Certificate Pending. | - | - | - | - | - | - | ||
38 | NAGINA(SC) | ||||||||||||||||
Yashwant Singh | 22/09/2014 | 18/05/2015 | - | 08/10/2015 | 03/08/2016 | - | 05/10/2016 | 13/07/2017 | - | 04/07/2018 | - | Eligible MPR not received, Audit Certificate Pending, Utilisation Certificate Pending. | - | - | - | ||
39 | HARDOI (SC) | ||||||||||||||||
Anshul Verma | 07/10/2014 | 21/05/2015 | - | 21/09/2015 | 25/05/2016 | - | 24/10/2016 | 15/05/2017 | - | 27/03/2018 | - | Eligible MPR not received, Audit Certificate Pending, Utilisation Certificate Pending. | - | - | - | ||
40 | HATHRAS (SC) | ||||||||||||||||
Rajesh Kumar Diwaker | 21/10/2014 | 12/01/2016 | - | 21/06/2016 | 14/07/2017 | - | 23/02/2018 | 31/05/2018 | - | 26/07/2018 | - | NIL | - | - | - | ||
41 | JALAUN(SC) | ||||||||||||||||
Bhanu Pratap Singh Verma | 14/10/2014 | 21/03/2016 | - | 22/11/2016 | 22/11/2017 | - | 19/06/2018 | - | Eligible MPR not received, Utilisation Certificate Pending. | - | - | - | - | - | - | ||
42 | SANT KABIR NAGAR | ||||||||||||||||
Sharad Tripathi | 07/10/2014 | 12/01/2016 | - | 26/10/2016 | 14/03/2017 | - | 03/07/2017 | 19/12/2017 | - | 22/03/2018 | - | Eligible MPR not received, Audit Certificate Pending. | - | - | - | ||
43 | JAUNPUR | ||||||||||||||||
Krishna Pratap "K. P." | 14/11/2014 | 05/08/2015 | - | 16/03/2016 | 24/11/2016 | - | 23/03/2017 | 27/03/2018 | - | 26/07/2018 | - | NIL | - | - | - | ||
44 | JHANSI | ||||||||||||||||
Uma Bharati | 02/01/2015 | 10/07/2015 | - | 30/05/2016 | 03/07/2017 | - | 26/12/2017 | 17/08/2018 | NIL | - | - | - | - | - | - | ||
45 | KAIRANA | ||||||||||||||||
Hukum Singh | 28/08/2014 | 12/03/2015 | - | 29/07/2015 | 22/01/2016 | - | 21/06/2016 | 30/11/2016 | - | 29/06/2017 | 27/03/2018 | - | - | - | Eligible MPR not received, Provisional Utilisation Certificate Pending. | ||
46 | KAISERGANJ | ||||||||||||||||
Brij Bhusan Sharan Singh | 03/09/2014 | 15/04/2015 | - | 16/12/2015 | 11/08/2016 | - | 27/10/2016 | 02/02/2018 | - | 21/06/2018 | - | Eligible MPR not received, Audit Certificate Pending, Utilisation Certificate Pending. | - | - | - | ||
47 | KANNAUJ | ||||||||||||||||
Dimple Yadav | 03/12/2014 | 06/09/2016 | - | 06/07/2017 | 13/07/2018 | - | - | - | Eligible MPR not received, Provisional Utilisation Certificate Pending. | - | - | - | - | - | - | ||
48 | KANPUR | ||||||||||||||||
Murli Monohar Joshi | 15/09/2014 | 05/06/2015 | - | 31/07/2015 | 07/04/2016 | - | 17/08/2016 | 20/10/2016 | - | 18/05/2017 | 05/02/2018 | - | - | - | Eligible MPR not received, Audit Certificate Pending, Utilisation Certificate Pending. | ||
49 | KAUSHAMBI(SC) | ||||||||||||||||
Vinod Kumar Sonkar | 28/10/2014 | 16/05/2016 | - | 20/10/2016 | 17/07/2017 | - | 30/11/2017 | 19/06/2018 | - | 23/08/2018 | - | NIL | - | - | - | ||
50 | KHERI | ||||||||||||||||
Ajay Kumar | 22/09/2014 | 15/04/2015 | - | 07/12/2015 | 17/05/2016 | - | 19/09/2016 | 15/05/2017 | - | 18/09/2017 | 15/05/2018 | - | - | - | Eligible MPR not received, Provisional Utilisation Certificate Pending. | ||
51 | DHAURAHRA | ||||||||||||||||
Rekha | 22/09/2014 | 15/04/2015 | - | 19/01/2016 | 17/08/2016 | - | 29/12/2016 | 25/07/2017 | - | 15/01/2018 | 19/06/2018 | - | - | - | Eligible MPR not received, Provisional Utilisation Certificate Pending. | ||
52 | LUCKNOW | ||||||||||||||||
Raj Nath Singh | 07/10/2014 | 08/07/2015 | - | 05/10/2015 | 06/09/2016 | - | 28/04/2017 | 19/04/2018 | - | 22/06/2018 | - | Eligible MPR not received, Audit Certificate Pending, Utilisation Certificate Pending. | - | - | - | ||
53 | MACHHLISHAHR(SC) | ||||||||||||||||
Ram Charitra Nishad | 07/10/2014 | 05/08/2015 | - | 16/03/2016 | 30/11/2016 | - | 23/03/2017 | 27/03/2018 | - | 26/07/2018 | - | NIL | - | - | - | ||
54 | MAHARAJGANJ | ||||||||||||||||
Pankaj Chowdhary | 03/09/2014 | 02/12/2015 | - | 10/06/2016 | 04/05/2017 | - | 31/08/2017 | 26/07/2018 | - | 31/08/2018 | - | NIL | - | - | - | ||
55 | MAINPURI | ||||||||||||||||
Tej Pratap Singh Yadav | 05/11/2014 | 12/05/2015 | - | 18/09/2015 | 19/04/2016 | - | 21/07/2016 | 29/12/2016 | - | 11/09/2017 | 06/03/2018 | - | - | - | Eligible MPR not received, Utilisation Certificate Pending. | ||
56 | MATHURA | ||||||||||||||||
Hema Malini | 03/09/2014 | 13/02/2015 | - | 07/08/2015 | 15/06/2016 | - | 09/09/2016 | 23/02/2018 | - | - | - | Eligible MPR not received, Provisional Utilisation Certificate Pending. | - | - | - | ||
57 | MEERUT | ||||||||||||||||
Rajendra Agarwal | 27/10/2014 | 05/08/2015 | - | 02/02/2016 | 02/11/2016 | - | 15/05/2017 | 11/04/2018 | - | 04/07/2018 | - | Eligible MPR not received, Audit Certificate Pending, Utilisation Certificate Pending. | - | - | - | ||
58 | MIRZAPUR | ||||||||||||||||
Anupriya Singh Patel | 28/10/2014 | 24/07/2015 | - | 09/05/2016 | 17/11/2016 | - | 15/03/2017 | 27/03/2018 | - | 26/07/2018 | - | NIL | - | - | - | ||
59 | MISRIKH(SC) | ||||||||||||||||
Anju Bala | 05/11/2014 | 07/08/2015 | - | 28/03/2016 | 14/10/2016 | - | 28/06/2017 | 16/03/2018 | - | 29/06/2018 | - | Under Process. | - | - | - | ||
60 | MOHANLALGANJ(SC) | ||||||||||||||||
Kaushal Kishore | 14/10/2014 | 05/08/2015 | - | 14/10/2015 | 03/10/2016 | - | 15/03/2017 | 16/02/2018 | - | 21/06/2018 | - | Eligible MPR not received, Audit Certificate Pending, Utilisation Certificate Pending. | - | - | - | ||
61 | MUZAFFARNAGAR | ||||||||||||||||
Sanjeev Kumar Balyan | 28/08/2014 | 24/03/2015 | - | 05/08/2015 | 28/06/2016 | - | 08/11/2016 | 23/03/2017 | - | 04/12/2017 | 09/03/2018 | - | - | - | Eligible MPR not received, Audit Certificate Pending, Utilisation Certificate Pending. | ||
62 | GHAZIABAD | ||||||||||||||||
Vijay Kumar Singh | 14/11/2014 | 20/07/2015 | - | 12/01/2016 | 10/11/2016 | - | 26/07/2017 | 27/03/2018 | - | 26/07/2018 | - | NIL | - | - | - | ||
63 | PHULPUR | ||||||||||||||||
Nagendra Pratap Singh Patel | 18/07/2014 | 17/07/2015 | - | 31/12/2015 | 22/06/2016 | - | 16/11/2016 | 26/04/2017 | - | 11/09/2017 | - | - | - | - | Eligible MPR not received, Audit Certificate Pending, Utilisation Certificate Pending. | ||
64 | PILIBHIT | ||||||||||||||||
Maneka Sanjay Gandhi | 26/08/2014 | 03/03/2015 | - | 24/07/2015 | 09/03/2016 | - | 12/07/2016 | 14/03/2017 | - | 14/09/2017 | 19/03/2018 | - | - | - | Eligible MPR not received, Provisional Utilisation Certificate Pending. | ||
65 | PRATAPGARH | ||||||||||||||||
Kuwar Harivansh Singh | 15/09/2014 | 13/07/2015 | - | 21/04/2016 | 06/09/2016 | - | 29/03/2017 | 18/09/2017 | - | 15/01/2018 | 31/05/2018 | - | - | - | Eligible MPR not received, Provisional Utilisation Certificate Pending. | ||
66 | RAE BARELI | ||||||||||||||||
Sonia Gandhi | 14/11/2014 | 24/07/2015 | - | 23/12/2015 | 26/07/2016 | - | 30/09/2016 | 28/06/2017 | - | 13/03/2018 | - | Eligible MPR not received, Audit Certificate Pending, Utilisation Certificate Pending. | - | - | - | ||
67 | RAMPUR | ||||||||||||||||
Nepal Singh | 28/10/2014 | 10/03/2015 | - | 12/06/2015 | 14/10/2015 | - | 11/04/2016 | 24/08/2016 | - | 03/05/2017 | 20/07/2017 | - | - | - | NIL | ||
68 | ROBERTSGANJ(SC) | ||||||||||||||||
Chhotelal | 26/09/2014 | 07/05/2015 | - | 04/11/2015 | 15/07/2016 | - | 22/11/2016 | 28/06/2017 | - | 27/03/2018 | 16/08/2018 | NIL | - | - | - | ||
69 | SAHARANPUR | ||||||||||||||||
Raghav Lakhanpal | 26/09/2014 | 24/03/2015 | - | 04/09/2015 | 09/03/2016 | - | 15/06/2016 | 24/10/2016 | - | 26/04/2017 | 17/07/2018 | - | - | - | Eligible MPR not received, Provisional Utilisation Certificate Pending. | ||
70 | KUSHI NAGAR | ||||||||||||||||
Rajesh Pandey Urf Guddu | 22/10/2014 | 27/02/2015 | - | 17/06/2015 | 31/12/2015 | - | 30/05/2016 | 02/12/2016 | - | 15/05/2017 | 22/02/2018 | - | - | - | NIL | ||
71 | SALEMPUR | ||||||||||||||||
Ravindra Kushawaha | 14/10/2014 | 26/06/2015 | - | 09/03/2016 | 30/11/2016 | - | 15/05/2017 | 11/12/2017 | - | 09/05/2018 | - | Incorrect Audit Certificate, Incorrect Utilisation Certificate. | - | - | - | ||
72 | SAMBHAL | ||||||||||||||||
Satyapal Singh | 03/09/2014 | 05/06/2015 | - | 22/01/2016 | 04/10/2016 | - | 21/12/2016 | 29/06/2017 | - | 02/02/2018 | 30/05/2018 | - | - | - | NIL | ||
73 | FATEHPUR SIKRI | ||||||||||||||||
Babulal | 07/11/2014 | 20/07/2015 | - | 05/10/2015 | 09/03/2016 | - | 17/05/2016 | 16/12/2016 | - | 07/07/2017 | 22/02/2018 | - | - | - | NIL | ||
74 | SHAHJAHANPUR(SC) | ||||||||||||||||
Krishna Raj | 27/10/2014 | 13/10/2015 | - | 19/10/2016 | 28/12/2016 | - | 30/11/2017 | 27/04/2018 | - | 19/06/2018 | 23/08/2018 | NIL | - | - | - | ||
75 | SITAPUR | ||||||||||||||||
Rajesh Verma | 21/10/2014 | 16/03/2015 | - | 22/01/2016 | 06/09/2016 | - | 28/11/2016 | 09/08/2017 | - | 28/12/2017 | 29/06/2018 | - | - | - | NIL | ||
76 | SULTANPUR | ||||||||||||||||
Feroze Varun Gandhi | 20/08/2014 | 13/03/2015 | - | 15/07/2015 | 08/04/2016 | - | 19/09/2016 | 06/07/2017 | - | 26/12/2017 | 10/05/2018 | - | - | - | Eligible MPR not received, Provisional Utilisation Certificate Pending. | ||
77 | UNNAO | ||||||||||||||||
Swami Sachchidanand Hari Sakshi | 26/08/2014 | 15/05/2015 | - | 14/03/2016 | 11/09/2017 | - | 18/04/2018 | - | Eligible MPR not received, Audit Certificate Pending, Utilisation Certificate Pending. | - | - | - | - | - | - | ||
78 | VARANASI | ||||||||||||||||
Narendra Modi | 24/07/2014 | 18/05/2015 | - | 30/10/2015 | 22/11/2016 | - | 31/03/2017 | 11/12/2017 | - | - | - | Eligible MPR not received, Provisional Utilisation Certificate Pending. | - | - | - | ||
79 | MORADABAD | ||||||||||||||||
Kunwer Servesh Kumar | 14/10/2014 | 30/09/2015 | - | 20/01/2016 | 06/09/2016 | - | 16/11/2016 | 11/09/2017 | - | 10/04/2018 | 17/08/2018 | NIL | - | - | - | ||
80 | LALGANJ (SC) | ||||||||||||||||
Neelam Sonkar | 07/10/2014 | 16/10/2015 | - | 02/06/2016 | 24/11/2016 | - | 26/04/2017 | 22/08/2017 | - | 26/12/2017 | 09/05/2018 | - | - | - | NIL |
Note | (i) |
Under MPLADS, the role of the Members of Parliament is limited only upto recommendation of works.Thereafter, it is the responsibility of the District Authority to sanction, execute and complete the works recommended by Members of Parliament within the stipulated time period. |
(ii) | The exact figure (s) of expenditure is available only with the District Authorities. |